Tank Raft Foundation On Driven Piles

  • Home
  • /
  • Pf
  • /
  • Tank Raft Foundation On Driven Piles

Tank Raft Foundation On Driven Piles

DateJanuary 2020
LocationSheffield, UK
ClientJohn D.
CategoryIndustrial

Role

Structural analysis and design calculations for the tank foundation (piles and slabs). Tank foundation plan, details, and specifications. Bar Bending Schedule.

Project Details

246.5 sq.m 350mm thick raft foundation to support a tank replacement with a tank internal diameter of 14.817m an a height of 12.95m with a capacity to hold 2203 cu.m of water. The raft foundation is sitting on 169 pieces driven piles due to weak soil on site.