Steel Frame Factory Extension

  • Home
  • /
  • Pf
  • /
  • Steel Frame Factory Extension

Steel Frame Factory Extension

DateJuly 2019
LocationTeemore, Northern Ireland
ClientColin W.
CategoryIndustrial Building, PEB Structure

Role

Structural calculations including loading analyses (wind, snow, dead, and live loads), and structural analysis and design calculations of all structural components (footings, baseplates, steel portal rrames, and Steel connections). Structural drawings including foundation plan, roof framing plan, structural details, and steel framing elevations, as well as general structural notes and specifications.

Project Details

An 840 sq.m. 7-bay Portal steel frame with 19.2m long unsupported rafter spans.

Share: